沧江路办公楼改造
面积:约5,000㎡
地点:佛山高明区
时间:2019-2021
状态:建成
改造从“剥开”开始。拆除覆盖的镀膜玻璃后,八十年代典型的梯形悬挑阳台显露真容——挑板纤薄而保存完好。设计决定将其完整保留,并在上下挑板间安装统一规格的弧形穿孔板,以正弧与反弧交错拼合,形成富有韵律的立面肌理。弧形选择不仅是视觉判断,更基于受力逻辑:弧形轮廓使荷载均匀传递,仅靠几组角件便可实现自承重,轻巧且经济。原有琉璃瓦和瓷砖一并拆除,整体刷白,以最朴素的方式赋予建筑明快、现代的质感。
中庭是空间重组的核心。主体结构历经多次加建无法改动,经费也极为有限,内廊式布局采光通风严重不足,L形平面转角处条件最差。设计将沿街垂直交通置换至此,改造为一座六层通高的绿化中庭,以两层一单元错层叠合。这一操作引入更多自然光线,同时释放出沿街最具价值的完整商业空间。内廊非承重实墙被玻璃取代,中庭贯通、内廊穿透,室内物理条件得到本质改善。
落地的过程充满曲折和妥协。原设想将中庭延续至屋顶形成垂直花园,因顶层出租而取消;疫情与成本压力导致部分穿孔板幕墙未实施;后期加装电梯更使中庭规模缩减。最终,沿街立面的穿孔板韵律、中庭的基本形态与空间品质提升,成为部分却真切兑现的目标。
Cangjiang Road Office Renovation
Area: Approx. 5,000 ㎡
Location: Gaoming District, Foshan
Year: 2019–2021
Status: Completed
Located on a main road in Gaoming, Foshan, this seven-story hotel was built in the early reform era—white tiles, yellow glazed roof, topped with a Chinese octagonal pavilion. Once a striking presence on the skyline, it was later converted into a nightclub with added extensions and enclosed balconies, then fell into silence after brief activity.
The renovation began with "peeling." Removing the coated glass revealed the original cantilevered balconies—slender slabs in good condition. We preserved them and inserted curved perforated panels between floors, alternating convex and concave arcs to create a rhythmic facade. The curved form also ensures even load distribution, enabling lightweight self-supporting construction with minimal components.
The atrium became the spatial core. With limited budget and unalterable structure, the L-shaped building suffered poor light and ventilation. We relocated vertical circulation to the corner and transformed it into a six-story green atrium with staggered mezzanines every two floors—bringing natural light inward and releasing valuable street-front commercial space. Solid non-load-bearing walls were replaced with glass; the atrium and corridors now enable cross-ventilation.
The process involved compromises. Plans to extend the atrium to the roof were abandoned; pandemic and cost pressures reduced the perforated panel installation; later elevator additions shrunk the atrium. Yet the rhythmic facade panels, the atrium's basic form, and improved spatial quality—these partial realizations still fulfilled the initial vision.
The renovation began with "peeling." Removing the coated glass revealed the original cantilevered balconies—slender slabs in good condition. We preserved them and inserted curved perforated panels between floors, alternating convex and concave arcs to create a rhythmic facade. The curved form also ensures even load distribution, enabling lightweight self-supporting construction with minimal components.
The atrium became the spatial core. With limited budget and unalterable structure, the L-shaped building suffered poor light and ventilation. We relocated vertical circulation to the corner and transformed it into a six-story green atrium with staggered mezzanines every two floors—bringing natural light inward and releasing valuable street-front commercial space. Solid non-load-bearing walls were replaced with glass; the atrium and corridors now enable cross-ventilation.
The process involved compromises. Plans to extend the atrium to the roof were abandoned; pandemic and cost pressures reduced the perforated panel installation; later elevator additions shrunk the atrium. Yet the rhythmic facade panels, the atrium's basic form, and improved spatial quality—these partial realizations still fulfilled the initial vision.